NVIDIA spans five layers of AI infrastructure: chips, networking, systems, software and cloud. It owns no fabs. TSMC makes its wafers, SK hynix, Micron and Samsung supply its memory, and builders such as Dell and Foxconn assemble its racks. Treating every connection as an “order” mixes up the strength of the evidence: an annual-report disclosure, a first delivery, racks running at a partner and a letter of intent are different things.

Continue researching NVIDIAOpen in map

Key companies

NVIDIA’s position across five layers

Layer, position and source
LayerNVIDIA’s positionSource
Chips and memory
See connections →

NVIDIA is fabless. It designs GPUs and Arm-based CPUs (Grace, now Vera) and relies on foundries, memory suppliers and contract manufacturers for every manufacturing step.

Networking
See connections →

NVLink interconnects and switches, and end-to-end InfiniBand and Ethernet platforms: network adapters, cables, DPUs, switch chips and systems, plus software. NVIDIA reports networking inside its Compute & Networking segment, whose revenue grew 18% from the prior quarter and 114% from a year earlier in Q2 FY2027.

Systems
See connections →

Data center products are typically delivered as rack-scale systems, subsystems or modules. OEMs and ODMs such as Dell, HPE, Supermicro, Foxconn and Wistron build the racks customers receive.

Software / CUDA
See connections →

CUDA runs on all NVIDIA GPUs and sits beneath hundreds of domain-specific libraries, frameworks and SDKs. NVIDIA describes its developer base and installed base as strengthening the ecosystem.

Cloud and customers
See connections →

Data center revenue was $89.0 billion in Q2 FY2027 (quarter ended July 26, 2026), up 117% from a year earlier. Most GPUs reach end users through hyperscalers, neoclouds and model labs, often indirectly via OEMs and ODMs.

Product roadmap: shipped vs announced

Vera Rubin
Announced / planned

Ramping; first racks delivered, broad shipments from fall 2026

Six chips (Vera CPU, Rubin GPU, NVLink 6 Switch, ConnectX-9, BlueField-4, Spectrum-6) announced in January 2026. NVIDIA said production shipments begin in fall 2026. Early racks are already running at CoreWeave and several clouds.

Suppliers, customers and partners

Reset
Connections and primary sources · 4
Connection / statusSources and limitsSource and next step
Hon Hai (Foxconn), Wistron, Fabrinet · Assembly and test
Shipped / in use Disclosed in annual report

Systems · Supplier

NVIDIA's 10-K says contract manufacturers such as Hon Hai, Wistron and Fabrinet perform assembly, testing and packaging of its final products.

What does this not establish?

"Such as" means the list is not complete. It does not say which rack systems each manufacturer builds.

Not yet in the company directory
Dell · First Vera Rubin NVL72 racks shipped
Shipped / in use Delivered to CoreWeave

Systems · System or technology partner

Dell said it was first to ship systems built on Vera Rubin, delivering PowerRack systems with PowerEdge XE9812 servers to CoreWeave.

What does this not establish?

A first delivery is a milestone, not a disclosed volume. It does not show Dell's share of Vera Rubin systems.

Open company →
Open in map →
HPE, Supermicro, Lenovo, Foxconn and others · Vera Rubin builders
Announced / planned Named as system builders

Systems · System or technology partner

NVIDIA listed Dell, HPE, Lenovo and Supermicro, as well as Foxconn, Quanta Cloud Technology, Wistron, Wiwynn and others, among system builders ramping Vera Rubin. It said production shipments start in fall 2026.

What does this not establish?

Being named in a launch list is not evidence that a given builder has shipped Vera Rubin systems.

Open company →
Open in map →
Supermicro · Named Vera Rubin builder
Announced / planned Named as system builder

Systems · System or technology partner

Supermicro is one of the top system builders NVIDIA names for Vera Rubin.

What does this not establish?

This does not establish shipped Vera Rubin systems or order sizes.

Open company →
Open in map →

What should you verify next?

The next Vera Rubin checkpoint is production shipments from fall 2026: watch for cloud instance launches, system-builder delivery announcements and Rubin’s revenue contribution in NVIDIA’s quarterly results. Letters of intent and “up to” commitments need a later purchase agreement or deployment announcement. This page preserves the scope of the cited evidence; it does not assume every announced plan has been fulfilled.